The Almirante Storni Pier consists of a main viaduct 12 meters wide that connects the operational berths to the mainland. It includes two vehicle lanes and two pedestrian walkways. Additionally, it features a protruding structure on the north side to accommodate a conveyor belt used for unloading raw materials for the company Aluar.

The total length of the pier is 1,583 meters, with berths 1 and 2 reaching depths of between 42 and 55 feet (equivalent to 12 and 16 meters, respectively).

The structure is composed of large-diameter piles grouped and joined by pile caps. This infrastructure supports the superstructure, which is made up of pre-stressed precast concrete beams.

A secondary viaduct, 197 meters long, connects the pier to berths 5 and 6, known as the “fishing pier”. These berths together offer a total berth frontage of 298 meters.

DATAS / BERTH Berth 1 Berth 2 Berth 3 Berth 4 Berth 5/6
Berth Length (m) 217 217 198 200 298
Width (m) 22 22,45 43 Dolphin Area 30
Area (m) 4774 4872 8514 Dolphin Area 4470
Depth (in feet) 39′ a 54′ 41′ a 54′ 31′ a 44′ 18′ a 30′ 13′ a 20′
Power Supply 220/380 V 220/380 V 220/380 V 220/380 V 220/380 V
Number of Power Outlets 4 3 4 3 10
Water Outlets 3 4 4 3 7
Custom Yard
Paved Area 27.180 M2
Compacted (Consolidated) Area 71.284 M2
Covered Warehouses

Bonded Warehouse 18.20 x 47.10 = 857.22 m²

Removable Warehouse 12.40 x 60.35 = 748.34 m²

Services
412 power outlets for refeer containers
Pier Area 22.630 M2
Bonded Warehouses 1.605,56 M2
Container Yard 27.180 M2 (concrete) – 71.284 M2 (compacted soil)

CERTIFIED WEIGHBRIDGES

LATORRE Scale Capacidad máxima autorizada 80.000 Kg.
FULL GaMa
El Calafate DIGITAL Scale
Capacidad máxima autorizada 80.000 Kg.
Platform Scale Capacidad máxima 3.000 Kg.

In-house Services

  • Potable Water Supply

  • Power Supply

  • Lighting

  • Solid Waste Collection

  • Internal Transportation Services

  • Emergency Medical Services

  • Firefighting System

  • Custom Yard

  • Generator Unit

Third-Party Services

  • Fuel Supply

  • Provisions Supply

  • Stevedoring and Cargo Handling

  • Ship Repair Workshops

  • Salvage and Diving Services

  • Pilotage and Support Boats

  • Customs Brokers

  • Shipping Agencies

  • Collection of Liquid and Solid Waste (MARPOL)

  • Passenger Transport

  • Fire Prevention on Ships and Facilities

  • Solid Waste Collection

Potable Water Supply

The Port Authority has a piping network in place to supply vessels. It operates a potable water pumping system with a maximum capacity of 40 m³/h. The main pipeline is a 4” galvanized steel pipe with 3” branches and 2½” connection outlets. It also features a 500 m³ reserve tank to ensure continuous service.

Water is provided to the Port Authority by the city’s Public Services Cooperative (SERVICOOP) on a continuous basis, with an average flow of 4,000 to 5,000 m³/month, which meets current demand without issue. All outlets are equipped with flow meters.

Power Supply

All berths are equipped with 380/220 V power outlets.

Berths 1, 2, 3, and 4 are powered by a substation located at berth 3, supplied by a 13.2 Kv line that runs through the raw materials conveyor gallery and connects to a 315 Kva transformer.

Outside the operational areas of Storni Pier, the customs yard area includes 412 power outlets for refrigerated container connections.

Lighting

The lighting system consists of 34 poles equipped with LED fixtures. Berths 3, 5, and 6 are fitted with 6 towers with high-power LED floodlights.

Berths 1 and 2 are equipped with 26 LED floodlights.

The system is automatically activated by photoelectric sensors.

Solid Waste Collection

Solid waste collection services are available for vessels docked at the port. Bilge water removal services are also available upon client request through licensed operators.

Internal Transportation Services

An internal passenger transport service operates within the Almirante Storni Pier, available 24 hours a day, 365 days a year.

Emergency Medical Service

A permanent medical emergency service is provided for any individual within the Storni Pier premises. The service includes a first aid room, a fully equipped ambulance, and a paramedic on duty 24/7 throughout the year.

Firefighting System

The port is equipped with a fire control system. Water is pumped from the sea at berth 3 using a FLYGT pump and a centrifugal pump, which together generate a working pressure of approximately 8 kg/cm² and a flow rate of about 90 m³/hour. This system supplies berths 1, 2, 3, and 4.

Berths 5 and 6 are served by two submersible electric pumps (one in reserve), each with a flow rate of 90 m³/h and a pressure of 5 kg/cm² (FLYGT model BS 2151 HT, 27 HP). The distribution network uses 110 mm HDPE piping and includes two types of hydrants: flush-mounted hydrants aligned with potable water outlets and above-ground hydrants located at the exit of the secondary viaduct, in front of the auxiliary building, at the base of the lighting towers, and at the end beacon tower.

The APPM also operates a portable Magirus Fire 1000 pump with a maximum capacity of 81 m³/h, available for use at any berth on either pier as needed.